Unmatched Technical Expertise
Our LEED Consulting is unmatched in the industry. We know what LEED rating and certification requires and we will therefore accomplish that for you.
Quick Turnaround
Our LEED Consulting Certification through USGBC is the quickest. We snure that everything is 100% before submissions.
Code Predetermination Filing And Consultation
Clear And Precise Code Predterminations
Confused about construction codes? Do you need to file a code predetermination appeal?
A lot of construction projects ask for determination requests. These are the applications to acquire written ruling on the interpretation of construction codes from the department of buildings. They may be called pre considerations, reconsiderations, waivers, clarifications, or interpretations.
Now, these are mainly of two types, the first, one being construction code determinations, and the second one being zoning resolution determinations. ATC Designers offers professional consultation and filing of construction code determinations (CD1).
Determination is an extremely effective, efficient, and useful tool we use for reaching and gaining approval in the Department of Buildings. We know the routes and when they are supposed to be utilized and implement them early in the filing process. This helps us ensure paramount filing strategy so that you can get your project cleared and start constructing.
Our team of engineers is adept at handling laborious paperwork and use a streamlined process to file your appeal. You can always expect superior service and the best experience to gain complete peace of mind.
What Is Code Predetermination?
CD1 covers all construction related variances or interpretations. We use this kind of filing for clarification or interpretation of an already existing construction code requirement. Also, if you request any additional variances for a construction application, we can submit them using this application.
Determinations are not to be used instead of compliance with the construction code. Every possible attempt must be made to provide the compliant option, which is also an as-of-right solution. If an issue is not met by this, only then determination filing should be requested for a variance of the building code.
Also, determination filings must not be used for a waiver of the accessibility requirements, which are a part of chapter 11 of the NYC building code. Such type of waiver request is to be submitted directly to the Mayor’s Office for People with Disabilities ¬(MOPD).
We help you decide whether you need to file a CD1 or need to undertake other options.
When Can You File A Code Predetermination?
You can file a CD1 when you are concerned about a specific construction code. It can be filed in several circumstances, including the ones listed below. A point to be noted is that they will only be considered if the following hardships occur:
- Creation of an undue financial or economic burden. Intended objective not achieved.
- Physically or legally impossible.
- Considered unnecessary in the light of other alternatives which also ensure the achievement of the object that is intended. At the same time, also insufficient considering the alternatives which achieve the intended objective without the loss in the levels of safety, and does so more effectively, efficiently or economically.
- Would involve a change so subtle as to produce a negligible amount of additional advantage consistent with the rules.
When to not submit a CD1?
The issues may or may not include, but most certainly are not limited to the examples that are as follows:
- Complaints
- Item waivers that are required
- Requests of plan examiner reassignment
- Inspection objections
- Requests of permit reinstatement
- Explanations of job HOLD or lift hold requests
- Requests for temporary certificates of occupancy
- Civil penalty waivers, administrative appeals, violations issued in error, etc
- Clarifications of any other requirements of the agency
Sub-Services We Provide
- Heat Recovery System Design
- Custom Air Handling Unit Design
- Ventilation System Design
- Outside Air System Design
- Sub Slab Depressurization System
- Laboratory Exhaust System
- Commercial Kitchen Hood Exhaust
- Indoor Air Quality Filtration Systems
- Water Cooled System Design
- Air Cooled AC System Design
- Legalization
- VRF System Design
Fast And Easy Code Predetermination
Purpose Of Writing A Code Predetermination
CD1, which stands for Construction code determination form, is used for the purpose of documenting official determination requests for the sake of department review.
The officials of the department will review your request and issue an appropriate determination. Any other issue that requires determination should and must be requested on the CD1 form. We can help you determine the issues that you need to include in your CD1.
We can use CD1 forms only in the following cases:
- Plain examiner objects.
- An objection that may occur in the future, for any application that is not yet filed.
If you are concerned about a construction code, you can go forward and file a CD1. You can do that in the circumstances listed below:
- Predetermination
- Request for the variation of construction code
- Appeal DOB plan exam objection
- The appeal of CD1 determination
- CD1 Predetermination
A predetermination is described as when you are concerned about your construction code before you are done filing with the department of buildings. At that time, you can ask the department of buildings to take a look into your issue, and then they can issue a predetermination. Later on, you can use this CD1 if there is an objection filed by a plan examiner if it is approved after you have filed.
The department of building fees for predetermination CD1 is one thousand dollars.
- Request for Variation of the Code
A request for a variation construction code is a situation where you are unable to interpret the applicability of code, but there is any different interpretation or code.
The filing fees of the department of buildings for the construction code variation CD1 is again, one thousand dollars.
- The Appeal of the Department of Buildings Plan Objection CD1
After you are done filing with the department of buildings, your plan examiner can issue an objection. We help you make an appointment with the plan examiner to review the objection as per CD1 requirements
“appeal of an affirmation of an objection after a second plan examination review.”
If you are through with your second review, and the plan examiner is providing you with an affirmation of the issued objection, but you still do not agree, you can also appeal with a CD1. You are supposed to have a second review first.
Department of buildings fees for the appeal of the department of building objection is one thousand dollars.
- The Appeal of a CD1 that has been Previously Denied
Last, but not the least, you may also file a CD1 to appeal for a CD1 that has been denied previously.
Department of building fees of appealing a previously denied CD1 is $2,500.
System Components In Our Designs
- Variable Refrigerant Flow (VRF) System
- Split Air Conditioner
- Packaged Air Conditioner
- Water Cooled System Design
- Air Cooled AC System Design
- Water Source Heat Pump
- Air Source Heat Pump Design
- Air Side Economizer Design
- Water Side Economizer Design
- Hot Water Radiators Design
- Boiler Plants
- Heat Exchanger Design
- Cooling Tower MEP Design
- Water Pump Systems Design
- Glycol System Services Design
- Radiant Heat Design
- NYE Boiler Design Services
- Chiller System Design
- Dual Fuel Boiler Design
- Centrifugal Chiller Design
- Exhaust Fan Design
- Absorption Chiller MEP Design
- PTAC Design Services
- Window Air Conditioner Design
- Steam Pressure Reducing Valve Station
- Steam Radiators Design
- Chilled Beams Design
- Building Automation System Design
- Building Management System (BMS) Design
We Guide You With Each Step
ATC Designers Code Predetermination Filing Process
After we have gathered all the information and filled the form, we submit to the appropriate borough and unit. The latest objection sheet is also submitted with any kind of determination request. We request you to bring a copy of the determination request for the scheduled appointment.
We make sure to submit a complete form and all required documentation in a complete pdf form, to the borough email address. Our team ensures that all details are provided accurately with no room for errors.
- Information of Location
This section will collect important job information, and is needed on every application. We can help you fill out the details of your project without any hassle.
- Information of Applicant
This section will contain all important applicant information. They are extremely important for every application. If the determination request is a result of an objection that is raised by a plan examiner, the application is supposed to be filed by a professional P.E or R.A, who has filed the job application.
If the job application has not, yet, been filed, and there is no applicant either, then the option is to be left blank. The applicant can be a co-director/ director of an approved private elevator inspection agency for elevator determinations.
We have experienced and licensed engineers and architects in our team who are authorized to help you out.
- Information of Attendee
This section will collect all important attendee information and is only required under the following circumstances a) the attendee and the applicant are different, or b) if the job application has not been filed yet and the applicant is nonexistent.
Our lawyers provide their attorney registration number. We can also send experienced attorneys to attend meetings to discuss either a determination or a predetermination.
- Nature of the Request
Our team helps you file out the nature of request mentioning all details like job number, code type and more. If the request has already been rejected once by the department officials, we make sure to attach the request or requests that have been rejected.
We also include any documents that can help with the review of the rejected determination request. We submit all the complete documentation and the form in one single pdf.
We make sure to include all information that contains the items below:
- Control numbers for the related CD1 requests
- Zoning districts, special districts, special overlays
- Code section – (for 1968 code, in the format of ‘27-###’ for the 2008/2014 code, in the format
- BBs (building bulletins)-(in the format of BB year-xx)
- TPPN, memo
- ZR section (format has to be xxxx-xxxx)
- Rue number (in the format of 1RNCY xxxx-xxxx)
- MDL (multiple dwelling law)-(in the format of MDL-xx)
It can be quite hectic to do all of these if you don’t have our professional guidance!
- Description of the Request
We highlight the reason for the determination request, and then also explain the reason for that request. Our team makes a list of all the documents that you have attached and submitted with this form, for example, any letters, forms, or sketches that are relevant.
If this request is supposed to appeal an objection that has been filed and issued by an examiner, we make sure to type the words of the objection from the objection sheet of the examiner, word to word. We also attach a copy of the examiner’s objection sheet.
- Statements and Signature
A seal and a signature or a P.E or R.A is an essential requirement to make sure that the requester is going to attest to the information that is provided. We make sure to double check the statement before signing it and sealing it.
Our attorneys are not required to seal the form but are required to include ‘esquire’ or ‘esq’ after their name. This is a must. They can sign a predetermination request.
Why Choose ATC Designers?
ATC Designers is experienced at handling the nuances of the DOB. Our team has worked with the department so many times that they know what works and what doesn’t We can help you file accurate CD1s which will never be rejected by the department. You can get quick predeterminations so that you can start executing your project at the earliest.
We have filed thousands of CD1s and know the process by our heart. You can always be sure of adept professional guidance to help you sail your boat no matter how troubled the waters are!
Get in touch with us to go forward with your code predetermination appeal.
Agencies Approvals We Secure
- Department Of Buildings (DOB)
- NFPA
- FDNY
- OER Approval
- HPD
- DEP
- Electrical Review Board
- National Electrical Committee (NEC)
Customized Design Services
- Tiny House Design
- Landmarks Building Design
- Modular Building Design
- Prefab Building Design